2026-09-02 · 6 min

贴纸交期到底几天?打样、量产、影响交期的因素与旺季排产

交期是采购最常被催的一件事,但很多人催得没道理。打样和量产是两套节奏,影响因素也不同。这篇讲清贴纸的真实交期区间、哪些环节会拖、旺季怎么排才能不误船期,以及下单前怎么把交期聊死。

贴纸交期到底几天?打样、量产、影响交期的因素与旺季排产

采购催交期之前,先分清楚两件事:打样要几天、量产要几天。把这两段混在一起催,工厂也没法给你准话。这篇把贴纸交期拆开讲。

一、两个区间:打样与量产

  • 打样:常规 3-5 天出实物;含新刀版开模的,加 1-2 天 / Sampling: normally 3 to 5 days for physical samples; add 1 to 2 days if a new cutting die is needed
  • 量产:常规 5-15 天,量级越大、工序越多,越靠近上限 / Mass production: normally 5 to 15 days; larger volume and more process steps push it toward the upper end
  • 加急:打样可压到 2 天、量产压到 5-7 天,但要插单费且看排产松紧 / Rush: sampling can compress to 2 days, mass production to 5 to 7 days, but needs a slotting fee and depends on the schedule

二、哪些环节会拖交期

  • 确认稿来回改:图稿每改一版,打样就要重排一次 / Artwork revisions: each revision of the artwork re-queues the sampling step
  • 新刀版开模:异形不是现成刀版,要等开模,这是量产前的硬等待 / New die: a shaped design without a stock die must wait for tooling — a hard wait before mass production
  • 材料缺货:指定颜色或厚度的卷材没库存,要调货或等生产 / Material shortage: a specified color or thickness of roll not in stock means waiting for replenishment
  • 后工序排队:烫金、模切、检品这些工序在多条订单间排队 / Finishing queue: foil, die-cut and inspection steps queue across multiple orders
  • 物流:海运拼箱等船期,这段不算工厂生产时间但算总交期 / Logistics: sea consolidation waits for a sailing, not factory time but part of total lead time

三、旺季怎么排才不误船期

贴纸的旺季和节日强相关:欧美圣诞、日本礼物季、国内开学季,都会集中挤产能。要稳交期,关键是把打样和确认稿尽量提前到淡季做,量产放在旺季前留出缓冲。很多客户等到节前一个月才确认稿,那时全行业都在抢机台,加急也排不进。

四、下单前怎么把交期聊死

  • 分开问:打样几天、量产几天、各自起算日是确认稿还是收款 / Ask separately: sampling days, mass-production days, and whether each clock starts at artwork confirmation or payment
  • 写进合同:交期写具体日期或工作日,并写明延期责任 / Put it in the contract: state a concrete date or working days, and the liability for delay
  • 确认稿锁定:图稿一旦确认不再改,改版重算交期 / Lock the artwork: once confirmed, no more changes; a revision restarts the lead time
  • 物流单列:海运/空运的时效和费用单独确认,别和工厂生产时间混算 / Logistics separate: confirm sea or air transit time and cost on its own, do not blend it with factory production time

亿康的交期政策

  • 打样 3-5 天,量产 5-15 天,加急可视排产插单 / Sampling 3 to 5 days, mass production 5 to 15 days, rush available subject to schedule
  • 确认稿锁定后不再免费改版,改版重排并重新计交期 / After artwork lock, free revisions stop; a change re-queues and restarts lead time
  • 旺季(节前 2 个月)建议提前确认稿,工厂预留产能 / For peak season (two months before a holiday) confirm artwork early so capacity is reserved
  • 物流时效单独报价,海运拼箱/整柜、空运按实际船期航班核算 / Logistics quoted separately: sea LCL/FCL and air priced to the actual sailing or flight